===== when to run opportunity loads ===== | ===== when to run opportunity loads ===== | ||
- | **The best time to run non-essential | + | The optimal |
- | Opportunity loads should not be applied | + | With **lead** this means **during |
+ | |||
+ | There is a little more wiggle room with [[electrical: | ||
+ | |||
+ | * the bank has reached | ||
+ | * or any time the bank can be // | ||
===== timing opportunity loads ===== | ===== timing opportunity loads ===== | ||
+ | |||
+ | The trickiest part of running opportunity loads is running them at the right time so battery charging is not affected. | ||
+ | |||
+ | |||
+ | ==== manual model ==== | ||
+ | |||
+ | |||
You can start the loads **manually** (ie, start using the power when you have extra). | You can start the loads **manually** (ie, start using the power when you have extra). | ||
- | The most precise way to do it **automatically** is to use a charge controller | + | ==== charge controller ==== |
+ | |||
+ | |||
+ | The most precise way to do it **automatically** is to use a charge controller | ||
+ | |||
+ | Read the documentation and ask their techs questions before taking this $$$ approach. | ||
+ | |||
+ | Related: | ||
+ | |||
+ | * you can also build a Pi or similar that talks to the controller over its communication port/ | ||
+ | * [[https:// | ||
+ | |||
+ | |||
+ | ==== diversion controller ==== | ||
+ | |||
+ | The [[https:// | ||
+ | |||
- | You can also build a Pi or similar that talks to the controller over its communication port/ | ||
==== LVD only ==== | ==== LVD only ==== | ||
Line 44: | Line 72: | ||
==== LVD + timer ==== | ==== LVD + timer ==== | ||
{{ : | {{ : | ||
- | A [[http:// | + | A [[http:// |
In this approach the LVD is set just below Vfloat as above, but activation of the loads is delayed by some amount of time. Observation of the system during charging will suggest how long it normally takes takes charging amperage to drop off (ie, when the system has surplus current). | In this approach the LVD is set just below Vfloat as above, but activation of the loads is delayed by some amount of time. Observation of the system during charging will suggest how long it normally takes takes charging amperage to drop off (ie, when the system has surplus current). | ||
- | Suggested delay for conservative opportunity loading == the time from [passing Vlvr setpoint during Bulk] to [completed charging].((settling to Float)). | + | Suggested delay for conservative opportunity loading == the time from [passing Vlvr setpoint during Bulk] to [completed charging].((settling to Float)). |
Line 58: | Line 86: | ||
This setup looks like: [LVD or controller LOAD output] --> timer --> relay --> load | This setup looks like: [LVD or controller LOAD output] --> timer --> relay --> load | ||
+ | ==== LVD + timer - eternal Absorption ==== | ||
+ | This setup avoids timer juggling/ | ||
+ | |||
+ | - [[electrical: | ||
+ | - observe how long Absorption actually takes to drop to [[electrical: | ||
+ | - set the LVD to just under Vabs, set the timer to the Absorption duration | ||
+ | |||
+ | Similar to the above, this setup looks like: [LVD or controller LOAD output] –> timer –> relay –> load | ||
===== uses for opportunity loads ===== | ===== uses for opportunity loads ===== | ||
+ | |||
+ | For best results the opportunity load should be sized to the excess power. | ||
+ | |||
+ | |||
+ | |||
* heating water | * heating water | ||
* [[hvac: | * [[hvac: | ||
* [[electrical: | * [[electrical: | ||
- | * rice cooker((http:// | + | * [[food:cooking: |