This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
electrical:solar:nonessential [2020/07/08 14:49] frater_secessus [charge controller] |
electrical:solar:nonessential [2020/07/08 14:56] frater_secessus [timing opportunity loads] |
||
---|---|---|---|
Line 26: | Line 26: | ||
===== timing opportunity loads ===== | ===== timing opportunity loads ===== | ||
+ | |||
+ | The trickiest part of running opportunity loads is running them at the right time so battery charging is not affected. | ||
+ | |||
+ | |||
+ | ==== manual model ==== | ||
+ | |||
+ | |||
You can start the loads **manually** (ie, start using the power when you have extra). | You can start the loads **manually** (ie, start using the power when you have extra). | ||