===== timing opportunity loads ===== | ===== timing opportunity loads ===== | ||
+ | |||
+ | The trickiest part of running opportunity loads is running them at the right time so battery charging is not affected. | ||
+ | |||
+ | |||
+ | ==== manual model ==== | ||
+ | |||
+ | |||
You can start the loads **manually** (ie, start using the power when you have extra). | You can start the loads **manually** (ie, start using the power when you have extra). | ||
Line 82: | Line 89: | ||
- set the LVD to just under Vabs, set the timer to the Absorption duration | - set the LVD to just under Vabs, set the timer to the Absorption duration | ||
+ | Similar to the above, this setup looks like: [LVD or controller LOAD output] โ> timer โ> relay โ> load | ||
===== uses for opportunity loads ===== | ===== uses for opportunity loads ===== |