User Tools

Site Tools


electrical:solar:nonessential

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
electrical:solar:nonessential [2020/07/08 14:49]
frater_secessus [charge controller]
electrical:solar:nonessential [2020/07/08 14:59]
frater_secessus [LVD + timer]
Line 26: Line 26:
  
 ===== timing opportunity loads ===== ===== timing opportunity loads =====
 +
 +The trickiest part of running opportunity loads is running them at the right time so battery charging is not affected.
 +
 +
 +==== manual model ====
 +
 +
 You can start the loads **manually** (ie, start using the power when you have extra).  This is error-prone but is free and requires no equipment (except your own memory). You can start the loads **manually** (ie, start using the power when you have extra).  This is error-prone but is free and requires no equipment (except your own memory).
  
Line 65: Line 72:
 In this approach the LVD is set just below Vfloat as above, but activation of the loads is delayed by some amount of time.  Observation of the system during charging will suggest how long it normally takes takes charging amperage to drop off (ie, when the system has surplus current). In this approach the LVD is set just below Vfloat as above, but activation of the loads is delayed by some amount of time.  Observation of the system during charging will suggest how long it normally takes takes charging amperage to drop off (ie, when the system has surplus current).
  
-Suggested delay for conservative opportunity loading == the time from [passing Vlvr setpoint during Bulk] to [completed charging].((settling to Float)).  This delay might be 2-3hours.+Suggested delay for conservative opportunity loading == the time from [passing Vlvr setpoint during Bulk] to [completed charging].((settling to Float)).  This delay might be 2-5hours.
  
  
Line 76: Line 83:
 ==== LVD + timer - eternal Absorption ==== ==== LVD + timer - eternal Absorption ====
  
-This setup avoids timer juggling/estimation and does not affect Absorption charging.+This setup avoids timer juggling/estimation and does not affect Absorption charging.The downside is the opportunity circuit engages much later
  
   - [[electrical:12v:eternal_absorption|set Vfloat to Vabs]]   - [[electrical:12v:eternal_absorption|set Vfloat to Vabs]]
Line 82: Line 89:
   - set the LVD to just under Vabs, set the timer to the Absorption duration   - set the LVD to just under Vabs, set the timer to the Absorption duration
  
 +Similar to the above, this setup looks like: [LVD or controller LOAD output] โ€“> timer โ€“> relay โ€“> load
  
 ===== uses for opportunity loads ===== ===== uses for opportunity loads =====
electrical/solar/nonessential.txt ยท Last modified: 2023/10/18 19:08 by frater_secessus