electrical:solar:nonessential
Differences
This shows you the differences between two versions of the page.
Both sides previous revision
Previous revision
|
Next revision
Both sides next revision
|
electrical:solar:nonessential [2023/10/18 19:04] frater_secessus [when to run opportunity loads] |
electrical:solar:nonessential [2023/10/18 19:04] frater_secessus [when to run opportunity loads] |
| |
* the bank has reached the intended charge state | * the bank has reached the intended charge state |
* or any time the bank can be //projected// to reach the intended charge state by sundown while carrying the extra loads. In effect, lithium allows you to "borrow" against future charging without penalty.. Exception: Lithium setups with PWM controllers solar charge controllers will make [[electrical:solar:pwm_tweaking|most power]] when bank voltage is highest. So waiting for Float or Absorption to run opportunity loads will mean the solar can make more Wh per day. | * or any time the bank can be //projected// to reach the intended charge state by sundown while carrying the extra loads. In effect, lithium allows you to "borrow" against future charging without penalty.. Exception: Lithium setups with PWM [[electrical:solar:charge_controller|solar charge controllers]] will make [[electrical:solar:pwm_tweaking|most power]] when bank voltage is highest. So waiting for Float or Absorption to run opportunity loads will mean the solar can make more Wh per day. |
| |
| |
electrical/solar/nonessential.txt ยท Last modified: 2023/10/18 19:08 by frater_secessus