This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
electrical:solar:overpaneling [2018/11/15 16:02] frater_secessus [MPPT and heat] |
electrical:solar:overpaneling [2020/10/11 19:48] 127.0.0.1 external edit |
||
---|---|---|---|
Line 3: | Line 3: | ||
**Overpaneling** has two related meanings; | **Overpaneling** has two related meanings; | ||
- | * [[# | + | * Most common meaning: |
- | * [[# | + | * Less common meaning: |
Line 30: | Line 30: | ||
* you want to get deeply cycled batteries charging as early as possible in the morning | * you want to get deeply cycled batteries charging as early as possible in the morning | ||
* you spend most of your time in areas with [[electrical: | * you spend most of your time in areas with [[electrical: | ||
+ | * you spend time in partial shade | ||
* you want to use a smaller controller instead of jumping up to the next size. Example, 43A max output and your choices are 40A or 60A controllers. | * you want to use a smaller controller instead of jumping up to the next size. Example, 43A max output and your choices are 40A or 60A controllers. | ||
Line 98: | Line 99: | ||
- | Overpaneling the bank gets lead-acid batteries charged faster and keeps them charged longer than other approaches. | + | Overpaneling the bank gets lead-acid batteries charged faster((faster/ |