This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
electrical:solar:panel-bank_ratio [2020/06/24 21:47] frater_secessus [1:1] |
electrical:solar:panel-bank_ratio [2020/06/24 21:52] frater_secessus [2:1 overpaneling] |
||
---|---|---|---|
Line 13: | Line 13: | ||
//2:1// == 200W solar + 100Ah of battery. | //2:1// == 200W solar + 100Ah of battery. | ||
This slightly [[electrical: | This slightly [[electrical: | ||
+ | |||
+ | Working backwards, successfully fully charging lead-chemisties by solar means only requires about 4.25hrs of Full Sun Equivalent on MPPT, and about 4.85hrs FSE with PWM. | ||
+ | |||
+ | On average, this would work in Little Rock, San Francisco, Phoenix, Birmingham, Atlanta, New Orleans, Albuquerque, | ||
+ | |||
===== 3:1 overpaneling ===== | ===== 3:1 overpaneling ===== | ||
//3:1// == 300W solar + 100Ah of battery. | //3:1// == 300W solar + 100Ah of battery. |