This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
electrical:converter [2022/10/01 16:20] frater_secessus [DIY smart converters] |
electrical:converter [2024/06/25 16:07] (current) frater_secessus [charging time available] |
||
|---|---|---|---|
| Line 22: | Line 22: | ||
| + | ===== choosing a converter ===== | ||
| + | If money is no object you can buy a multistage (" | ||
| + | * [[electrical: | ||
| + | * 0.2C for FLA at 50% SoC | ||
| + | * 0.4C is not LiFePO4' | ||
| + | |||
| + | |||
| + | ==== cost ==== | ||
| + | |||
| + | |||
| + | The higher the rating and the more features the more expensive the shore power charger. | ||
| + | |||
| + | ==== limits of 15A shore power ==== | ||
| + | |||
| + | 13A off a 15A [[electrical: | ||
| + | |||
| + | |||
| + | ==== minimum | ||
| + | |||
| + | |||
| + | Lead chemistries require a minimum charge rate to stay healthy. | ||
| + | |||
| + | * 0.2C for AGM | ||
| + | * 0.1C for Flooded Lead Acid | ||
| + | * [LiFePO4 has no minimum current spec] | ||
| + | |||
| + | |||
| + | ==== charging time available ==== | ||
| + | |||
| + | If you have solar and will be on shore power for more than one day then **a simple converter that charges at the batteries' | ||
| + | |||
| + | If you do not have solar or will be on shore power for only one overnight then we need a three-stage (" | ||
| Line 51: | Line 83: | ||
| ==== DIY dumb converters ==== | ==== DIY dumb converters ==== | ||
| - | " | + | " |
| - | If loads are run off the converter in the daytime the converter will just be supporting the solar yield and can be rather small. | + | If loads are run off the converter in the daytime the converter will just be supporting the solar yield and can be rather small. |