This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
electrical:converter [2023/10/16 12:25] frater_secessus [choosing a converter] |
electrical:converter [2024/06/25 12:07] (current) frater_secessus [charging time available] |
||
---|---|---|---|
Line 44: | Line 44: | ||
- | Lead chemistries require a minimum charge rate to stay healthy. | + | Lead chemistries require a minimum charge rate to stay healthy. |
* 0.2C for AGM | * 0.2C for AGM | ||
Line 53: | Line 53: | ||
==== charging time available ==== | ==== charging time available ==== | ||
- | If you have solar and will be on shore power for more than one day then a simple converter that charges at the batteries' | + | If you have solar and will be on shore power for more than one day then **a simple converter that charges at the batteries' |
If you do not have solar or will be on shore power for only one overnight then we need a three-stage (" | If you do not have solar or will be on shore power for only one overnight then we need a three-stage (" | ||
Line 85: | Line 85: | ||
" | " | ||
- | If loads are run off the converter in the daytime the converter will just be supporting the solar yield and can be rather small. | + | If loads are run off the converter in the daytime the converter will just be supporting the solar yield and can be rather small. |