| === demand scheduling === | === demand scheduling === | ||
| - | Sometimes just changing when the load runs can eliminate/ | + | Sometimes just changing when the load runs can eliminate/ |
| Line 71: | Line 71: | ||
| === charging bottlenecks === | === charging bottlenecks === | ||
| + | |||
| + | Charging bottlenecks occur when the battery bank could happily [[opinion: | ||
| + | |||
| + | A major cause of underperformance is **reliance on a single form of charging**. | ||
| + | |||
| + | |||
| + | * solar | ||
| + | * maybe we have no solar at all | ||
| + | * maybe we have unused roofspace to devote to more panel | ||
| + | * maybe the panel we have is [[opinion: | ||
| + | * maybe we went with portable panels but [[https:// | ||
| + | * maybe we went with mounted panels but park the rig in the shade. | ||
| + | * alternator | ||
| + | * maybe we are not charging from the alternator at all | ||
| + | * maybe we are forgetting to enable charging from the alt after [[electrical: | ||
| + | * maybe the alternator has [[electrical: | ||
| + | * shore power | ||
| + | * maybe we are not [[electrical: | ||
| === bank capacity bottlenecks === | === bank capacity bottlenecks === | ||
| + | |||
| + | If you can charge the bank consistently but run out of power overnight or in periods of decreased harvest you may just need more bank capacity. | ||
| + | |||
| === throughput bottlenecks === | === throughput bottlenecks === | ||
| + | These are related to the systems above, but are less obvious. | ||
| + | * panels and PWM solar charge controllers poorly matched, resulting in [[electrical: | ||
| + | * insufficient panel wattage | ||
| + | * panel wattage grossly oversized for the MPPT controller (>30% [[electrical: | ||
| + | * DC-DC [[electrical: | ||
| + | * wiring undersized for alternator charging with a combiner (relay/ | ||