This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
electrical:12v:charging [2019/01/03 16:46] frater_secessus [equalization stage] |
electrical:12v:charging [2019/01/03 16:46] frater_secessus [equalization stage] |
||
---|---|---|---|
Line 54: | Line 54: | ||
- | Water levels should be topped off //after// equalization. Doing so before equalization could result in spillover. | + | Water levels should be topped off //after// equalization.((exposed plates should be covered before EQ, though)) |