User Tools

Site Tools


electrical:12v:charging

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
electrical:12v:charging [2019/02/04 13:15]
frater_secessus [equalization]
electrical:12v:charging [2019/04/11 19:50]
frater_secessus [charge-and-stop]
Line 59: Line 59:
 ===== charge-and-stop ===== ===== charge-and-stop =====
  
-[[electrical:solar:charge_controller#shunt_controllers|Shunt chargers]] have a charge-and-stop approach where they:+[[electrical:solar:charge_controller#shunt_controllers|Shunt]] (on/off) chargers have a charge-and-stop approach where they:
   - charge to [[electrical:12v:hvd|High Voltage Disconnect]] (Vhvd) and stop   - charge to [[electrical:12v:hvd|High Voltage Disconnect]] (Vhvd) and stop
   - fall in voltage to a High Voltage Reconnect (Vhvr)   - fall in voltage to a High Voltage Reconnect (Vhvr)
Line 92: Line 92:
  
  
-If water levels are below the plates, add enough water to cover the places before equalizing.  Then top off //after// equalization.  Doing so before equalization could result in spillover and loss of electrolyte.+If water levels are below the plates, add enough water to cover the plates before equalizing.  Then top off //after// equalization.  Topping off before equalization could result in spillover and loss of electrolyte.
  
  
electrical/12v/charging.txt ยท Last modified: 2023/09/16 12:22 by frater_secessus