This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
electrical:solar:charge_controller [2018/11/20 13:06] frater_secessus |
electrical:solar:charge_controller [2019/02/01 20:17] frater_secessus [MPPT] |
||
---|---|---|---|
Line 29: | Line 29: | ||
- DC-DC downconvert excess voltage to amps | - DC-DC downconvert excess voltage to amps | ||
- | During Bulk phase when maximum power is required((or at other time when loads + charging >= panel output)) the controller will run the panels at Vmp (the maximum power point). | + | When maximum power is required((in Bulk or at other time when loads + charging >= panel output)) the controller will run the panels at Vmp (the maximum power point). |
[[http:// | [[http:// |