User Tools

Site Tools


electrical:solar:charge_controller

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
electrical:solar:charge_controller [2018/11/20 13:06]
frater_secessus
electrical:solar:charge_controller [2019/02/01 20:17]
frater_secessus [MPPT]
Line 29: Line 29:
   - DC-DC downconvert excess voltage to amps   - DC-DC downconvert excess voltage to amps
  
-During Bulk phase when maximum power is required((or at other time when loads + charging >= panel output)) the controller will run the panels at Vmp (the maximum power point).   At other times the controller will find a less-than-maximum power point to match panel output to system needs.+When maximum power is required((in Bulk or at other time when loads + charging >= panel output)) the controller will run the panels at Vmp (the maximum power point).   At other times the controller will find a less-than-maximum power point to match panel output to system needs.
  
 [[http://amzn.to/2yP01Ob|{{https://images-na.ssl-images-amazon.com/images/I/512x3hbc6jL._AC_US160_.jpg }}]] [[http://amzn.to/2yP01Ob|{{https://images-na.ssl-images-amazon.com/images/I/512x3hbc6jL._AC_US160_.jpg }}]]
electrical/solar/charge_controller.txt ยท Last modified: 2024/04/16 20:28 by frater_secessus