electrical:solar:charge_controller_setpoints

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
electrical:solar:charge_controller_setpoints [2020/05/23 11:41]
frater_secessus [charging setpoints]
electrical:solar:charge_controller_setpoints [2020/05/23 11:42]
frater_secessus [charging setpoints]
Line 29: Line 29:
   * **Absorption restart** - voltage (or duration) at which Absorption stage after failing to maintain Vfloat   * **Absorption restart** - voltage (or duration) at which Absorption stage after failing to maintain Vfloat
   * **Equalization duration** - the amount of time the controller will hold Vequal.   * **Equalization duration** - the amount of time the controller will hold Vequal.
 +  * **Equalization frequency** - the number of days between equalization. ​ 30 days is typical. ​
 ===== load setpoints ===== ===== load setpoints =====
 Only present on controllers with LOAD outputs. Only present on controllers with LOAD outputs.
electrical/solar/charge_controller_setpoints.txt ยท Last modified: 2020/05/23 11:42 by frater_secessus