Line 29: Line 29:
   * **Absorption restart** - voltage (or duration) at which Absorption stage after failing to maintain Vfloat   * **Absorption restart** - voltage (or duration) at which Absorption stage after failing to maintain Vfloat
   * **Equalization duration** - the amount of time the controller will hold Vequal.   * **Equalization duration** - the amount of time the controller will hold Vequal.
 +  * **Equalization frequency** - the number of days between equalization.  30 days is typical. 
 ===== load setpoints ===== ===== load setpoints =====
 Only present on controllers with LOAD outputs. Only present on controllers with LOAD outputs.