User Tools

Site Tools


electrical:solar:nonessential

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
electrical:solar:nonessential [2020/07/08 11:13]
frater_secessus [timing opportunity loads]
electrical:solar:nonessential [2020/07/08 11:26]
frater_secessus [LVD + timer]
Line 44: Line 44:
 ==== LVD + timer ==== ==== LVD + timer ====
 {{ :electrical:solar:discretionaryTimer.png?400|}} {{ :electrical:solar:discretionaryTimer.png?400|}}
-A [[http://amzn.to/2pN3O9o|12v timer]] could give the system a chance to make some progress in Absorption before starting up opportunity loads.  +A [[http://amzn.to/2pN3O9o|12v timer]] could give the system a chance to make some progress in Absorption before starting up opportunity loads.  If mistimed or overly heavy loads applied, Absorption duration could be affected. 
  
  
Line 57: Line 57:
  
 This setup looks like:  [LVD or controller LOAD output] --> timer --> relay --> load This setup looks like:  [LVD or controller LOAD output] --> timer --> relay --> load
 +
 +==== LVD + timer - eternal Absorption ====
 +
 +This setup avoids timer juggling/estimation and does not affect Absorption charging.
 +
 +  - set Vfloat to Vabs
 +  - observe measure how long Absorption actually takes to drop to [[electrical:solar:charge_controller_setpoints|endAmps]] on your system
 +  - set the LVD to just under Vabs, set the timer to the Absorption duration
  
  
electrical/solar/nonessential.txt ยท Last modified: 2023/10/18 19:08 by frater_secessus