User Tools

Site Tools


electrical:solar:nonessential

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
electrical:solar:nonessential [2020/07/08 14:56]
frater_secessus [timing opportunity loads]
electrical:solar:nonessential [2020/07/08 14:58]
frater_secessus [LVD + timer - eternal Absorption]
Line 83: Line 83:
 ==== LVD + timer - eternal Absorption ==== ==== LVD + timer - eternal Absorption ====
  
-This setup avoids timer juggling/estimation and does not affect Absorption charging.+This setup avoids timer juggling/estimation and does not affect Absorption charging.The downside is the opportunity circuit engages much later
  
   - [[electrical:12v:eternal_absorption|set Vfloat to Vabs]]   - [[electrical:12v:eternal_absorption|set Vfloat to Vabs]]
Line 89: Line 89:
   - set the LVD to just under Vabs, set the timer to the Absorption duration   - set the LVD to just under Vabs, set the timer to the Absorption duration
  
 +Similar to the above, this setup looks like: [LVD or controller LOAD output] โ€“> timer โ€“> relay โ€“> load
  
 ===== uses for opportunity loads ===== ===== uses for opportunity loads =====
electrical/solar/nonessential.txt ยท Last modified: 2023/10/18 19:08 by frater_secessus