electrical:solar:nonessential [2020/07/08 14:58]
frater_secessus [LVD + timer - eternal Absorption]
electrical:solar:nonessential [2020/07/08 14:59]
frater_secessus [LVD + timer]
Line 72: Line 72:
 In this approach the LVD is set just below Vfloat as above, but activation of the loads is delayed by some amount of time.  Observation of the system during charging will suggest how long it normally takes takes charging amperage to drop off (ie, when the system has surplus current). In this approach the LVD is set just below Vfloat as above, but activation of the loads is delayed by some amount of time.  Observation of the system during charging will suggest how long it normally takes takes charging amperage to drop off (ie, when the system has surplus current).
  
-Suggested delay for conservative opportunity loading == the time from [passing Vlvr setpoint during Bulk] to [completed charging].((settling to Float)).  This delay might be 2-3hours.+Suggested delay for conservative opportunity loading == the time from [passing Vlvr setpoint during Bulk] to [completed charging].((settling to Float)).  This delay might be 2-5hours.
  
  