User Tools

Site Tools


electrical:solar:nonessential

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
electrical:solar:nonessential [2023/10/18 18:59]
frater_secessus [when to run opportunity loads]
electrical:solar:nonessential [2023/10/18 19:07]
frater_secessus [when to run opportunity loads]
Line 19: Line 19:
 ===== when to run opportunity loads ===== ===== when to run opportunity loads =====
  
-**The best time to run non-essential loads is when there is power** in excess of battery charging requirements.   +The optimal time to run loads is when there is **power available in excess of battery charging requirements**.  When done at the right time, the loads are effectively run [[electrical:solar:offthepanel|off the panels]] rather than off the battery bank.  This allows you go to into sundown and morning with a higher state of charge
  
-With lead this means **during Float, or after current has started dropping off in Absorption** enough that the system can run the loads and still maintain the Absorption voltage setpoint.  There is a little more wiggle room with [[electrical:12v:deep_cycle_battery#lithium_chemistries|LiFePO4]];  the loads can be run with no net effect on a Lithium system when+With **lead** this means **during Float**, or **in late Absorption** when charge current acceptance has fallen enough that the system can run the loads //and still maintain the Absorption voltage setpoint//.  
  
-  * the bank has reached the intended charge state +There is a little more wiggle room with [[electrical:12v:deep_cycle_battery#lithium_chemistries|LiFePO4]];  the loads can be run with no net negative effect on a Lithium system when 
-  * or any time the bank can be projected to carry the opportunity load //and still hit the intended charge state by sundown// Exception:  Lithium setups with PWM controllers solar charge controllers will make [[electrical:solar:pwm_tweaking|most power]] when bank voltage is highest.  So waiting for Float or Absorption to run opportunity loads will mean the solar can make more Wh per day.+ 
 +  * the bank has reached the intended charge state; or 
 +  * any time the bank can be //projected// to reach the intended charge state by sundown while carrying the extra loadsIn effect, lithium allows you to "borrow" against future charging without penalty..   Exception:  Lithium setups with PWM [[electrical:solar:charge_controller|solar charge controllers]] will make [[electrical:solar:pwm_tweaking|most power]] when bank voltage is highest.  So waiting for Float or Absorption to run opportunity loads will mean the solar can make more Wh per day.
  
  
electrical/solar/nonessential.txt · Last modified: 2023/10/18 19:08 by frater_secessus