 ===== when to run opportunity loads ===== ===== when to run opportunity loads =====
  
-The optimal time to run loads is when there is **power available in excess of battery charging requirements**.  +The optimal time to run loads is when there is **power available in excess of battery charging requirements**.  When done at the right time, the loads are effectively run [[electrical:solar:offthepanel|off the panels]] rather than off the battery bank.  This allows you go to into sundown and morning with a higher state of charge. 
  
 With **lead** this means **during Float**, or **in late Absorption** when charge current acceptance has fallen enough that the system can run the loads //and still maintain the Absorption voltage setpoint//.   With **lead** this means **during Float**, or **in late Absorption** when charge current acceptance has fallen enough that the system can run the loads //and still maintain the Absorption voltage setpoint//.  