User Tools

Site Tools


electrical:solar:overpaneling

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
electrical:solar:overpaneling [2019/09/02 15:21]
frater_secessus [Overpaneling]
electrical:solar:overpaneling [2020/01/21 10:12] (current)
frater_secessus [vs. battery bank]
Line 99: Line 99:
  
  
-Overpaneling the bank gets lead-acid batteries charged faster and keeps them charged longer than other approaches. ​ This minimizes [[electrical:​depth_of_discharge#​partial_state_of_charge|battery murdering partial state of charge conditions]] found in [[electrical:​solar:​overbanking|overbanking]].+Overpaneling the bank gets lead-acid batteries charged faster((faster/​shorter Bulk charging stages -  Absorption duration will not be affected)) ​and keeps them charged longer than other approaches. ​ This minimizes [[electrical:​depth_of_discharge#​partial_state_of_charge|battery murdering partial state of charge conditions]] found in [[electrical:​solar:​overbanking|overbanking]].
  
  
electrical/solar/overpaneling.txt ยท Last modified: 2020/01/21 10:12 by frater_secessus