User Tools

Site Tools


electrical:solar:panel-bank_ratio

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
electrical:solar:panel-bank_ratio [2020/06/24 22:32]
frater_secessus [1:1]
electrical:solar:panel-bank_ratio [2020/06/24 22:34]
frater_secessus [1:1]
Line 9: Line 9:
 Working backwards, fully charging lead-chemistries by 1:1 solar means requires about 8.45hrs of Full Sun Equivalent on MPPT, and about 9.7hrs FSE with PWM. **There is nowhere in the United States that averages 8.45hrs of FSE year around**.  The highest is Honolulu with an average of 5.96hrs. The highest monthly average is Las Vegas in June (7.69hrs). Working backwards, fully charging lead-chemistries by 1:1 solar means requires about 8.45hrs of Full Sun Equivalent on MPPT, and about 9.7hrs FSE with PWM. **There is nowhere in the United States that averages 8.45hrs of FSE year around**.  The highest is Honolulu with an average of 5.96hrs. The highest monthly average is Las Vegas in June (7.69hrs).
  
-Fully-charging becomes possible with attentive panel tilt, requiring only 5.5hrs on MPPT and 6.4hrs on PWM.+Workarounds: 
 + 
 +  * fully-charging lead becomes possible with attentive panel tilt, requiring only 5.5hrs on MPPT and 6.4hrs on PWM
 +  * fully-charging lead becomes possible with shallower cycling, like 75%.  This is the equivalent of the 2:1 systems below
  
 ===== 2:1 overpaneling ===== ===== 2:1 overpaneling =====
electrical/solar/panel-bank_ratio.txt · Last modified: 2023/10/22 10:45 by frater_secessus