electrical:solar:shallow_cycling [2020/01/14 15:49] frater_secessus [sample build] |
electrical:solar:shallow_cycling [2020/01/14 15:58] frater_secessus [sample build] |
===== sample build ===== | ===== sample build ===== |
| |
* 100w poly((for least expensive and best performance with [[electrical:solar:shunt_tweaking|shunt]]/[[electrical:solar:pwm_tweaking|pwm [[electrical:solar:charge_controller|controllers]]]])) panel on the roof, either a rack-mounted framed panel or a flex panel adhered to the surface. | Total cost, ~$140. |
| |
| |
| * 100w poly((for least expensive and best performance with [[electrical:solar:shunt_tweaking|shunt]]/[[electrical:solar:pwm_tweaking|pwm [[electrical:solar:charge_controller|controllers]]]])) panel on the roof, either a [[https://amzn.to/2snWQOL|rack-mounted framed panel]] that fits rack dimensions or a [[https://amzn.to/30rmAGD|flex panel]] adhered to the surface. |
* [[https://amzn.to/2ToGWyX|cable gland]] for getting wires through roof | * [[https://amzn.to/2ToGWyX|cable gland]] for getting wires through roof |
* panel wires runs down the vehicle A-pillar inside the passenger area -- can be on driver or passenger side depending on where starter battery is located | * panel wires runs down the vehicle A-pillar inside the passenger area((can be on driver or passenger side depending on where starter battery is located)) and into the PANEL terminals of a [[electrical:solar:shunt_tweaking|$10 shunt]] solar [[electrical:solar:charge_controller|charge controller]] mounted in the footwell or elsewhere |
* wires run to a [[electrical:solar:shunt_tweaking|$10 shunt]] solar [[electrical:solar:charge_controller|charge controller]] | * [[https://amzn.to/2RhbHmD|wire]] run from controller's BATTERY terminals to the starter battery. |
* controller's BATTERY wires run from the controller to the starter battery. | * wire run from controller's LOAD terminals to [[https://amzn.to/3adk9vJ|12v/usb outlet]], power bus, etc |
* controller's LOAD wires run to outlet, power bus, etc | |
| |