This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
electrical:solar:slim_reserve [2019/05/07 23:48] frater_secessus [fractional reserves] |
electrical:solar:slim_reserve [2019/05/07 23:53] frater_secessus [zero reserves] |
||
---|---|---|---|
Line 21: | Line 21: | ||
===== zero reserves ===== | ===== zero reserves ===== | ||
+ | In areas with abundant and consistent [[electrical: | ||
+ | Overpaneling 3:1 or more may be required, as well as the addition of alternator or other forms of [[electrical: | ||
+ | |||
+ | Time-shifting loads to [[electrical: | ||