This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
electrical:solar:slim_reserve [2020/01/19 19:45] frater_secessus [zero reserves] |
electrical:solar:slim_reserve [2020/01/19 19:47] frater_secessus ues |
||
---|---|---|---|
Line 10: | Line 10: | ||
> In light-colored full overcast I see yields 25% of usual. | > In light-colored full overcast I see yields 25% of usual. | ||
+ | ===== techniques ===== | ||
+ | Overpaneling 3:1 or more may be required, as well as the addition of alternator or other forms of [[electrical: | ||
+ | |||
+ | Time-shifting loads to [[electrical: | ||
===== fractional reserves ===== | ===== fractional reserves ===== | ||