This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
electrical:solar:status [2018/05/28 10:53] frater_secessus [in absorption] s/12.6/14.6/g |
electrical:solar:status [2018/12/31 14:04] frater_secessus [then observe the controller] |
||
---|---|---|---|
Line 46: | Line 46: | ||
===== then observe the controller ===== | ===== then observe the controller ===== | ||
- | These checks are admittedly crude but will help see if your system is getting it done. No expensive or specialized equipment is required. MPPT controllers in particular will reveal a great deal of information by how they interact with the panels. | + | These checks are admittedly crude but will help see if your system is getting it done. No [[electrical: |
For the examples below we will assume the system is set up this way: | For the examples below we will assume the system is set up this way: |