This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
rv:build:steps [2019/03/27 09:39] frater_secessus [mocking up] |
rv:build:steps [2019/03/27 09:44] frater_secessus [roof] |
||
---|---|---|---|
Line 39: | Line 39: | ||
this is done early so metal debris can be swept/ | this is done early so metal debris can be swept/ | ||
- | - fan - cut hole, install, leave wiring | + | - [[hvac: |
- | - solar | + | - [[electrical: |
- install rack or tabs | - install rack or tabs | ||
- | - install panels | + | - install |
- install wiring entry point | - install wiring entry point | ||
- | - insulate ceiling | + | - insulate ceiling |
===== floor ===== | ===== floor ===== | ||
- cut any needed holes for vents, drains, etc | - cut any needed holes for vents, drains, etc | ||
- | - **body modification** - cut any holes for water entry, shore power connectors, etc. Note: traditionally **hookups go on the driver' | + | - **body modification** - cut any holes for water entry, |
===== acoustic dampening ===== | ===== acoustic dampening ===== |