User Tools

Site Tools


rv:build:steps

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
rv:build:steps [2019/03/27 09:43]
frater_secessus [floor]
rv:build:steps [2019/03/27 09:44]
frater_secessus [roof]
Line 39: Line 39:
  
 this is done early so metal debris can be swept/vacuumed out easily this is done early so metal debris can be swept/vacuumed out easily
-    - fan - cut hole, install, leave wiring accessable +    - [[hvac:roof_vent|fan]] - cut hole, install, leave wiring accessible 
-    - solar+    - [[electrical:solar:gentle_intro|solar]]
       - install rack or tabs       - install rack or tabs
-      - install panels+      - install [[electrical:solar:panels|panels]]
       - install wiring entry point       - install wiring entry point
-    - insulate ceiling+    - insulate ceiling and cover ceiling if desired
  
 ===== floor ===== ===== floor =====
rv/build/steps.txt · Last modified: 2020/10/11 19:48 (external edit)