User Tools

Site Tools


rv:build:steps

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
rv:build:steps [2019/03/27 06:43]
frater_secessus [floor]
rv:build:steps [2019/03/27 06:44] (current)
frater_secessus [roof]
Line 39: Line 39:
  
 this is done early so metal debris can be swept/​vacuumed out easily this is done early so metal debris can be swept/​vacuumed out easily
-    - fan - cut hole, install, leave wiring ​accessable +    - [[hvac:​roof_vent|fan]] - cut hole, install, leave wiring ​accessible 
-    - solar+    - [[electrical:​solar:​gentle_intro|solar]]
       - install rack or tabs       - install rack or tabs
-      - install panels+      - install ​[[electrical:​solar:​panels|panels]]
       - install wiring entry point       - install wiring entry point
-    - insulate ceiling+    - insulate ceiling ​and cover ceiling if desired
  
 ===== floor ===== ===== floor =====
rv/build/steps.txt · Last modified: 2019/03/27 06:44 by frater_secessus