This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
electrical:solar:charge_controller_setpoints [2020/05/23 14:41] frater_secessus [charging setpoints] |
electrical:solar:charge_controller_setpoints [2020/10/18 12:36] frater_secessus [non-setpoint settings] |
||
---|---|---|---|
Line 29: | Line 29: | ||
* **Absorption restart** - voltage (or duration) at which Absorption stage after failing to maintain Vfloat | * **Absorption restart** - voltage (or duration) at which Absorption stage after failing to maintain Vfloat | ||
* **Equalization duration** - the amount of time the controller will hold Vequal. | * **Equalization duration** - the amount of time the controller will hold Vequal. | ||
+ | * **Equalization frequency** - the number of days between equalization. | ||
===== load setpoints ===== | ===== load setpoints ===== | ||
Only present on controllers with LOAD outputs. | Only present on controllers with LOAD outputs. | ||
Line 38: | Line 38: | ||
===== non-setpoint settings ===== | ===== non-setpoint settings ===== | ||
- | * **Maximum charge rate: | + | * **Maximum charge rate: |
- | * **Minimum charge rate: | + | * **Minimum charge rate: |