User Tools

Site Tools


electrical:solar:nonessential

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
electrical:solar:nonessential [2023/10/18 19:02]
frater_secessus [when to run opportunity loads]
electrical:solar:nonessential [2023/10/18 19:03]
frater_secessus [when to run opportunity loads]
Line 19: Line 19:
 ===== when to run opportunity loads ===== ===== when to run opportunity loads =====
  
-The optimal time to run loads is when there is **power in excess of battery charging requirements**.  +The optimal time to run loads is when there is **power available in excess of battery charging requirements**.  
  
-With **lead** this means **during Float**, or **in late Absorption** where charge current acceptance has fallen enough that the system can run the loads //and still maintain the Absorption voltage setpoint//.  +With **lead** this means **during Float**, or **in late Absorption** when charge current acceptance has fallen enough that the system can run the loads //and still maintain the Absorption voltage setpoint//.  
  
-There is a little more wiggle room with [[electrical:12v:deep_cycle_battery#lithium_chemistries|LiFePO4]];  the loads can be run with no net effect on a Lithium system when+There is a little more wiggle room with [[electrical:12v:deep_cycle_battery#lithium_chemistries|LiFePO4]];  the loads can be run with no net negative effect on a Lithium system when
  
   * the bank has reached the intended charge state   * the bank has reached the intended charge state
electrical/solar/nonessential.txt ยท Last modified: 2023/10/18 19:08 by frater_secessus