This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
electrical:solar:nonessential [2023/10/18 19:03] frater_secessus [when to run opportunity loads] |
electrical:solar:nonessential [2023/10/18 19:03] frater_secessus [when to run opportunity loads] |
||
---|---|---|---|
Line 21: | Line 21: | ||
The optimal time to run loads is when there is **power available in excess of battery charging requirements**. | The optimal time to run loads is when there is **power available in excess of battery charging requirements**. | ||
- | With **lead** this means **during Float**, or **in late Absorption** | + | With **lead** this means **during Float**, or **in late Absorption** |
- | There is a little more wiggle room with [[electrical: | + | There is a little more wiggle room with [[electrical: |
* the bank has reached the intended charge state | * the bank has reached the intended charge state |