This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
12v:sg_troubleshooting [2024/12/11 14:47] frater_secessus s/sg/ps/g |
12v:sg_troubleshooting [2025/06/24 19:47] (current) frater_secessus [must I use the PS brand's proprietary solar panels?] |
||
|---|---|---|---|
| Line 12: | Line 12: | ||
| ===== must I use the PS brand' | ===== must I use the PS brand' | ||
| - | No, you can use any panel that meets spec. Consult the power station' | + | No, you can use any panel that meets the PS' requirements. Consult the power station' |
| '' | '' | ||
| Line 20: | Line 20: | ||
| * panel((or panel string, if wired in series)) Vmp must be ≥12.0v | * panel((or panel string, if wired in series)) Vmp must be ≥12.0v | ||
| * panel Voc must be ≤45.0v | * panel Voc must be ≤45.0v | ||
| - | * the controller will allow ≤10A of input current((although the inner workings of PS are often undocumented, | + | * the controller will allow ≤10A of input current.((Standalone solar charge |
| Sometimes the spec will also state the voltage range where the panels can be run at maximum power: | Sometimes the spec will also state the voltage range where the panels can be run at maximum power: | ||
| Line 29: | Line 29: | ||
| ==== maxxing out the solar input ==== | ==== maxxing out the solar input ==== | ||
| + | |||
| + | [note: | ||
| Power station solar input docs give a Max Wattage spec with a voltage range and usually a current limit. | Power station solar input docs give a Max Wattage spec with a voltage range and usually a current limit. | ||
| Line 38: | Line 40: | ||
| * 40Vmp x 10A = 400w | * 40Vmp x 10A = 400w | ||
| - | + | So a general rule of thumb to get the most power out of panel + SG combo is to select panels that will (by themselves or when arranged in series) have a Voc toward((not //at//)) the upper end of the PS' input limit. | |
| - | Sometimes no current limit is stated and we have to back into it. In our case the 500w will be attainable | + | |
| ==== can I overpanel my power station? ==== | ==== can I overpanel my power station? ==== | ||
| Line 57: | Line 57: | ||
| ===== the DC outlets don't have enough power to run my DC loads ===== | ===== the DC outlets don't have enough power to run my DC loads ===== | ||
| - | There is no easy/ | + | There is no elegant or power-efficient |
| + | |||
| + | But **if you already own the PS** you could run [[https:// | ||
| + | For loads that only exceed 10A on startup (looking at you, [[hvac: | ||
| ===== my PS doesn' | ===== my PS doesn' | ||