This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
electrical:12v:wiring [2022/09/17 14:19] frater_secessus [basic principles] |
electrical:12v:wiring [2022/09/17 14:25] (current) frater_secessus [critical vs noncritical applications] |
||
---|---|---|---|
Line 26: | Line 26: | ||
* battery bank to fuse panel | * battery bank to fuse panel | ||
* power distribution runs from one side of the van to the other (bus to bus) | * power distribution runs from one side of the van to the other (bus to bus) | ||
+ | * DC-DC charging of the house bank from alternator | ||
+ | * sensitive electronics | ||
+ | * inverters running large loads | ||
**Noncritical applications** can accept voltage sag of ≤10%. | **Noncritical applications** can accept voltage sag of ≤10%. | ||
- | * isolator charging of the | + | * isolator charging of the house bank ([[electrical: |
+ | * MaxxFan control boards are sensitive to overvoltage and may prefer some sag | ||