This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
electrical:solar:charge_controller_setpoints [2020/10/18 16:36] frater_secessus [non-setpoint settings] |
electrical:solar:charge_controller_setpoints [2025/12/24 22:58] (current) |
||
|---|---|---|---|
| Line 27: | Line 27: | ||
| Less common setpoints: | Less common setpoints: | ||
| * **Absorption duration** - the amount of time Vabs will be held until dropping to Vfloat. | * **Absorption duration** - the amount of time Vabs will be held until dropping to Vfloat. | ||
| - | * **Absorption restart** - voltage (or duration) at which Absorption stage after failing to maintain Vfloat | + | * **Absorption restart** - voltage (or duration) at which Absorption stage after failing to maintain Vfloat. Sometimes called //rebulk// or // |
| * **Equalization duration** - the amount of time the controller will hold Vequal. | * **Equalization duration** - the amount of time the controller will hold Vequal. | ||
| * **Equalization frequency** - the number of days between equalization. | * **Equalization frequency** - the number of days between equalization. | ||