| ===== 1:1 ===== | ===== 1:1 ===== | ||
| //1:1// == 200W solar + 200Ah battery bank. | //1:1// == 200W solar + 200Ah battery bank. | ||
| - | This generally considered the minimum, | + | This is generally considered the minimum, |
| - | [[electrical: | + | |
| - | + | ||
| - | Working backwards, successfully fully charging lead-chemisties by 1:1 solar means requires about 8.45hrs of Full Sun Equivalent on MPPT, and about 9.7hrs FSE with PWM. **There is nowhere in the United States that averages 8.45hrs of FSE year around**. | + | |
| + | [[https:// | ||
| + | Workarounds: | ||
| + | * add [[electrical: | ||
| + | * use a battery chemistry that charges more efficiently and doesn' | ||
| + | * fully-charging lead becomes possible with attentive panel tilt, requiring only 5.5hrs on MPPT and 6.4hrs on PWM. | ||
| + | * fully-charging lead becomes possible with shallower cycling, like 75%. This is the equivalent of the 2:1 systems below. | ||
| ===== 2:1 overpaneling ===== | ===== 2:1 overpaneling ===== | ||
| Line 16: | Line 19: | ||
| This slightly [[electrical: | This slightly [[electrical: | ||
| - | Working backwards, successfully fully charging lead-chemisties | + | Working backwards, successfully fully charging lead-chemistries |
| On average, this would work in Little Rock, San Francisco, Phoenix, Birmingham, Atlanta, New Orleans, Albuquerque, | On average, this would work in Little Rock, San Francisco, Phoenix, Birmingham, Atlanta, New Orleans, Albuquerque, | ||
| Line 25: | Line 28: | ||
| ' | ' | ||
| - | Working backwards, successfully fully charging lead-chemisties | + | Working backwards, successfully fully charging lead-chemistries |
| - | On average this this opens up everything but Canada and Anchorage AK. | + | On //average// this this opens up everything but Canada and Anchorage AK. |
| ===== 1:2 underpaneling ===== | ===== 1:2 underpaneling ===== | ||
| //1:2// == 100W solar + 200Ah of battery. | //1:2// == 100W solar + 200Ah of battery. | ||
| Line 39: | Line 42: | ||
| Different battery types have different charging requirements: | Different battery types have different charging requirements: | ||
| - | * lithium - no minimum, charge at any rate up to the max | + | * lithium - no minimum, charge at any rate((see [[electrical: |
| * flooded lead-acid: | * flooded lead-acid: | ||
| * minimum ratio with MPPT = 1.25w:1ah | * minimum ratio with MPPT = 1.25w:1ah | ||