Overpaneling has two related meanings; both refer to having more solar panel output than a system might otherwise require.

  • overpaneled charge controller - battery bank and charge controller are evenly matched; panel nominal or actual output is more than the controller's rating.
  • overpaneled battery bank - solar panels and charge controller are evenly matched; both are oversized compared to battery bank.

Note: overpaneling is not overvolting, which would be exceeding the maximum input voltage of the charge controller. Overvolting often results in damage to the controller; it can be caused by linking too many panels in series, or running too close to the voltage max in conditions that raise the panels' Voc.1)

vs. charge controller

www.nacleanenergy.com_images_articles_novemberdecember2014_solar_advancedenergy_figure1.jpg Overpaneling, or having “too much” panel for the rating of your MPPT charge controller, can be desirable in some situations. It is a trade-off that biases the setup to get more power out of normal and marginal conditions at the expense of the peak output during optimal conditions.2)

In car terms, the overpaneled system trades away some of the panels' top-end output for more low- and mid-range grunt. – secessus

The overpaneled system's power output bell curve is shifted upwards and cut off by the controller when it reaches its limits. This is known as clipping, trimming, or clamping due to the “flat top” appearance of the overpaneled output curve.

Example: Consider the image to the right.3) The smaller/interior bell curve is the normally paneled configuration.
The larger/exterior curve is the overpaneled configuration.
The striped area is the peak power “clipped” by the controller when the controller is overpaneled.
The horizontal line is the peak output of the normal and overpaneled configurations; they are both capped at the controller's rated output.
The green area is the additional power produced during suboptimal conditions. These areas are sometimes called shoulders due to their shape.

Overpaneling might be a good fit for you if your MPPT controller is designed to clamp down on excessive power without damage and

  • you want to get the most out of “shoulder” periods
  • you want to get deeply cycled batteries charging as early as possible in the morning
  • you spend most of your time in areas with marginal insolation, like the Pacific Northwest
  • you want to use a smaller controller instead of jumping up to the next size. Example, 43A max output and your choices are 40A or 60A controllers.

MPPT and heat

Overpaneling can increase heat in PPT charge controllers

  1. during late absorption phase; and
  2. when there is very little load being used

This occurs because the PPT controller moves Vpanel toward Voc to reduce current when less is needed but battery voltage is high, as in late Absorption . Counterintuitively, some load to the system can drop PV voltage (and therefore CC temps) to lower levels.4)

clipping is relatively uncommon

[This section is based on a forum post - secessus]

Perhaps counterintuiitively, overpaneled systems in normal5) conditions don't need to constrain power that often. A couple reasons for this:

  1. Overpaneled systems start collecting usable power earlier in marginal light. Secessus observes that by the time the sun is high enough to theoretically max out the controller, it has already completed Bulk and the bank's current acceptance is dropping.
  2. Because of temperature derating the panels will usually be peaking at something like 75% of rated power. Yes, perfect storms of altitude and cold can yield max+ power; that is when clamping/limiting kicks in.

how MPPT controllers clip power

[note: this section was based on a forum post and is therefore more personal in style – secessus]

img.mousetrap.net_misc_100d_54543.1503503640.1280.1280_38558.1503694532.500.750.jpgThe ability of MPPT controllers to clip power is a function of their ability to select arbitary powerpoints, thereby forcing the panel to produce the amount of power associated with a given powerpoint.

Fictional example:

  • 100W Renogy mono panel, RNG-100d, under laboratory conditions
  • 5A MPPT controller
  • Vmp == 18.9, Imp == 5.29.
  • battery in Bulk, 13v at the moment

If the controller was rated at 10A it would run the panel wide open at Vmp (18.9v). That would mean ~7.7A going into the battery.6)

But that can't happen because the 5A controller is undersized. 5A output at our present 13v charging voltage would be 65w, quite a bit down from the rated 100W. The controller protects itself by forcing the panel to produce less power.7) This is called clamping, clipping, current limiting, overcurrent protection and a few other marketing terms.

the gory details

img.mousetrap.net_misc_renogy100monocurve-65w.jpgConsider the power curve for this panel:

The dotted green line is Pmax (max power). The solid green line is the “power curve”. The heavy horizontal black line is at 65w.8)

The intersection of Watts and Volts on the curve is a power point.9)

The heavy vertical black line10) comes down from that intersection at 21v.11)

In this case the controller wants to limit panel output to 65w So it runs the panel at 21v, which is a far cry from Vmp. Then it downconverts the excess voltage to amps: it charges the battery12) 5A @ 13v.13)

corollaries

If you have the curve and Vpanel you can derive the power output.
If you have the curve and you know Wpanel you can derive Vpanel.
If you have a lot of time and patience, you can plot Vpanel and Wpanel to draw the curve yourself.

vs. battery bank

In this configuration there is abundant solar power and relatively little bank capacity. This is sometimes called underbanking.

“…the person draining their batteries to the 50% range regularly would do much better with a 2 watts to 1Ah ratio, or even 3 to 1.” – SternWake14)

Overpaneling the bank gets lead-acid batteries charged faster and keeps them charged longer than other approaches. This minimizes battery murdering partial state of charge conditions found in overbanking.

Overpaneling the bank would work best when:

  • you want your lead-chemistry batteries to stay as charged as much as possible
  • you are in an area with relatively little sunshine
  • you want to save battery weight
  • you want to reduce battery investment and complexity
  • the bulk of power is consumed in the daytime and relatively little at night (cf. opportunity loads)
  • you spend most of your time in an area with many hours of good sun15)
  • you want deeply discharged batteries to get charged as soon as possible in the morning

Since the underbanked system has less capacity will reduce your actual reserve days of power to some extent. But during daytime there is some solar power coming in and an overpaneled configuration will harvest relatively more power in sub-optimal conditions. The smaller bank will get through Bulk and well into Absorption faster, too. This will help extend the effective reserve days of power.

2)
sun overhead, clear sky, low temps
3)
The image is that of a different PV-related configuration but it works for our purposes.
5)
non-optimal
6)
not addressing conversion losses here
7)
by pushing Vpanel beyond Vmax so power starts dropping
8)
added by secessus; not in the original graphic
9)
Yes, these are the power points the Maximum Power Point Tracking controller is in the business of tracking. Once it learns them it can vary panel voltage to select any power point along the curve. Now you have seen the Matrix and you will never be the same. :-)
10)
also added by secessus
11)
It also crosses at ~11v but most MPPT downconvert rather than boost, so 11v is not useful.
12)
or runs loads
13)
this same mechanism is used to reduce power in Absorption and Float stages
15)
like the desert southwest