User Tools

Site Tools


opinion:solar:sizing

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Last revision Both sides next revision
opinion:solar:sizing [2023/11/22 10:21]
frater_secessus [solar panels]
opinion:solar:sizing [2023/12/26 11:54]
frater_secessus [battery bank]
Line 40: Line 40:
       * if you have undersized solar       * if you have undersized solar
       * you have lead-chemistry battery bank       * you have lead-chemistry battery bank
 +      * if charging is time-limited and you want maximal harvest from the alternator, shore, or other high-current charging source.  **Example: ** If battery specs say you can constant-charge at [[electrical:12v:battery_capacity|0.2C]] (20A per 100Ah of capacity) then((all other things being equal)) a 100Ah bank could take 20A, 200Ah could take 40A, and 300Ah could take 60A.  
  
 You will need **somewhat less Ah capacity** You will need **somewhat less Ah capacity**
opinion/solar/sizing.txt ยท Last modified: 2023/12/26 11:57 by frater_secessus