This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
electrical:solar:nonessential [2023/10/18 19:07] frater_secessus [when to run opportunity loads] |
electrical:solar:nonessential [2023/10/18 19:08] (current) frater_secessus [when to run opportunity loads] |
||
---|---|---|---|
Line 19: | Line 19: | ||
===== when to run opportunity loads ===== | ===== when to run opportunity loads ===== | ||
- | The optimal time to run loads is when there is **power available in excess of battery charging requirements**. | + | The optimal time to run loads is when there is **power available in excess of battery charging requirements**. |
With **lead** this means **during Float**, or **in late Absorption** when charge current acceptance has fallen enough that the system can run the loads //and still maintain the Absorption voltage setpoint// | With **lead** this means **during Float**, or **in late Absorption** when charge current acceptance has fallen enough that the system can run the loads //and still maintain the Absorption voltage setpoint// |