This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
opinion:more_power [2025/05/19 13:17] frater_secessus [big picture: how close are we to the goal line?] |
opinion:more_power [2025/05/19 13:50] (current) frater_secessus [supply problems] |
||
---|---|---|---|
Line 58: | Line 58: | ||
Doctor - "Stop doing that." | Doctor - "Stop doing that." | ||
- | Some loads are mandatory and we can't "stop doing that" | + | Some loads are mandatory and we can't "stop doing that" |
=== demand scheduling === | === demand scheduling === | ||
Sometimes just changing when the load runs can eliminate/ | Sometimes just changing when the load runs can eliminate/ | ||
- | |||
- | |||
Line 73: | Line 71: | ||
=== charging bottlenecks === | === charging bottlenecks === | ||
+ | |||
+ | Charging bottlenecks occur when the battery bank could happily [[opinion: | ||
+ | |||
+ | A major cause of underperformance is **reliance on a single form of charging**. | ||
+ | |||
+ | |||
+ | * solar | ||
+ | * maybe we have no solar at all | ||
+ | * maybe we have unused roofspace to devote to more panel | ||
+ | * maybe the panel we have is [[opinion: | ||
+ | * maybe we went with portable panels but [[https:// | ||
+ | * maybe we went with mounted panels but park the rig in the shade. | ||
+ | * alternator | ||
+ | * maybe we are not charging from the alternator at all | ||
+ | * maybe we are forgetting to enable charging from the alt after [[electrical: | ||
+ | * maybe the alternator has [[electrical: | ||
+ | * shore power | ||
+ | * maybe we are not [[electrical: | ||
=== bank capacity bottlenecks === | === bank capacity bottlenecks === | ||
+ | |||
+ | If you can charge the bank consistently but run out of power overnight or in periods of decreased harvest you may just need more bank capacity. | ||
+ | |||
=== throughput bottlenecks === | === throughput bottlenecks === | ||
+ | These are related to the systems above, but are less obvious. | ||
+ | * panels and PWM solar charge controllers poorly matched, resulting in [[electrical: | ||
+ | * insufficient panel wattage | ||
+ | * panel wattage grossly oversized for the MPPT controller (>30% [[electrical: | ||
+ | * DC-DC [[electrical: | ||
+ | * wiring undersized for alternator charging with a combiner (relay/ | ||